Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Southeast Asia needs $7.1 trillion for infrastructure by 2040

    November 12, 2026

    Nigeria and EU seal readmission deal after decade of talks

    November 12, 2026

    DAE revenue climbs 13.2% to $1.45 billion in nine months

    November 12, 2026
    Facebook X (Twitter) Instagram
    Syria News FlashSyria News Flash
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Syria News FlashSyria News Flash
    Home » Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender
    Uncategorized

    Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender

    September 28, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Chinese battery maker takes 75% of capacity with 25-year system life and desert-engineered storage technology.

    RIYADH, Saudi Arabia, Sept. 28, 2026 /PRNewswire/ — Saudi Power Procurement Company (SPPC) has awarded China’s Gotion High-Tech 6 GWh in the kingdom’s first utility-scale battery storage program—about 75% of the total tender, signaling how seriously Saudi Arabia is pursuing its 2030 energy transition goals. The G1 project totals 2 GW/8 GWh and is valued at roughly $1.16 billion. Gotion secured all three core sites—Al Muwayah, Haden and Al Kahafa—each 500 MW/2 GWh, making it the largest single technology supplier.

    The contract marks the first international large-scale deployment of Gotion Grid, its utility-scale storage system. Gotion says its edge is not price but engineering for extreme conditions. The system operates from -30°C to 55°C, uses a desert-optimized thermal management system that maintains full output during sandstorms and cuts high-temperature degradation by 40% versus conventional systems. It offers a 25-year design life, 25% longer than the industry average of 15–20 years, eliminating mid-life equipment replacement—a key factor for BOO contracts requiring 20-plus years of operation. An AI-powered battery management system enables intelligent dispatch, proactive safety warnings and full lifecycle diagnostics. All three sites can be remotely operated and integrated into Saudi Arabia’s 380 kV backbone grid.

    For investors, the award signals three shifts. Saudi storage procurement is moving faster than expected; G1 is awarded and G2 is underway, positioning Gotion for further phases. Competition is increasingly focused on lifecycle economics and extreme-environment performance over upfront pricing. Gotion is also building a regional footprint: roughly 9 GWh across the Middle East and North Africa, including a 1.5 GWh BESS in Egypt with a planned 3 GWh local manufacturing base, and a 1.2 GWh Morocco project with ACWA Power. Globally, its cumulative system-level storage projects exceed 10 GWh, including a 281 MW/843 MWh solar-storage project in Australia under construction and expected to reach commercial operation in 1H 2027.

    The Saudi award does not appear to be a one-off. As renewable penetration rises and grid stability becomes a priority, G1’s technical standards are likely to carry weight in future tenders. The question for Gotion is whether it can convert its early lead into sustained regional market share.

    Cision View original content:https://www.prnewswire.co.uk/news-releases/gotion-secures-75-of-saudi-arabias-first-utility-scale-bess-tender-302891502.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email

    Related Posts

    Letter from a Kenyan friend: An avocado’s story of China-Kenya cooperation

    November 11, 2026

    Hankook & Company Group Showcases Mobility Technologies at Automechanika Dubai 2026

    November 11, 2026

    Daewoong Pharmaceutical Hosts Exclusive Global KOL Summit in Bali to Shape the Future of NABOTA

    November 11, 2026

    Four Recipients Granted The Sigourney Award-2026 for Transformative Contributions to Psychoanalytic Thought

    November 10, 2026
    Latest News

    Southeast Asia needs $7.1 trillion for infrastructure by 2040

    November 12, 2026

    Nigeria and EU seal readmission deal after decade of talks

    November 12, 2026

    DAE revenue climbs 13.2% to $1.45 billion in nine months

    November 12, 2026

    Modi and Zelenskyy discuss peace efforts and bilateral ties

    November 11, 2026

    Ghana Minority demands funding plan for $10bn New Economy

    November 11, 2026

    Samsung cash pile tops 200 trillion won, a first in Korea

    November 9, 2026

    UAE and Tanzania explore wider economic and trade cooperation

    November 9, 2026
    © 2026 Syria News Flash | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.