Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Carestream Launches NEW Lux HD 35 and Lux HD 43 Detectors for Medical Imaging

    June 10, 2026

    U.S. Polo Assn. Returns to Downtown London as Official Apparel and Jersey Partner of Chestertons Polo in the Park

    June 9, 2026

    GA-ASI Announces Investments in Six Dutch Companies

    June 9, 2026
    Facebook X (Twitter) Instagram
    Syria News FlashSyria News Flash
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Syria News FlashSyria News Flash
    Home » Shanghai Electric Complete Pakistan’s Largest Thermal Power Project With Local Fuel, Thar Block-1 Integrated Coal Mine and Power Project, for 30 Days
    PR Newswire

    Shanghai Electric Complete Pakistan’s Largest Thermal Power Project With Local Fuel, Thar Block-1 Integrated Coal Mine and Power Project, for 30 Days

    March 6, 2023
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Two 660MW high-parameter supercritical units completed a 168-hour full-load reliability run test that can meet the electricity needs of almost 4 million local households

    THAR PARKAR, Pakistan, March 6, 2023 /PRNewswire/ — The Thar Block-1 integrated coal mine and power project (“the Project” or “Thar Project”) of Shanghai Electric (SEHK: 2727, SSE:601727) in Pakistan officially entered commercial operation on February 5, 2023, after both units passed the Reliability Run Test successfully after 168 hours’ full-load operation. The Project will provide about 9 billion kilowatt-hours of clean electricity to the local grid every year, meeting the power demands of nearly 4 million households.

    Shanghai Electric Complete Pakistan’s Largest Thermal Power Project With Local Fuel, Thar Block-1 Integrated Coal Mine and Power Project, for 30 Days.

    “The Project represents Shanghai Electric’s first Build- Own-Operate (BOO) project, developed, constructed and operated with a total investment of nearly US$3 billion. Since construction began in March 2019, we are delighted to have effectively addressed the local power shortage issue with our technology and complete solutions. Through our partnership with local stakeholders and utilizing local fuel, we are making significant contributions to lower energy prices, improve energy structure, alleviate the energy importing crisis, and strengthen national energy security,” said Donghai Meng, Director CEO of Thar Coal Block-I Power Generation.

    The Project, with a total capacity of 1320 MW, is supported by an open-pit coal mine that produces 7.8 million tons of lignite (brown coal) annually. The Project includes equipment with advanced technology, such as high-parameter steam turbines, generators, tower type boilers, high-pressure heaters, low-pressure heaters, condensers, de-aerators, 108 supporting motors, blowers, induced draft fans, cooling fume fans, and low-temperature economizers, all provided by Shanghai Electric.  It will serve as a benchmark for the utilization of Thar energy in the future because of its tailor-designed technology that fits Pakistan’s local fossil fuel needs.

    Empowering the local community

    The Thar Project not only represents a significant milestone for Shanghai Electric but also contributes to the social and economic development of the local community. In addition to providing over 15,000 jobs during the construction and paying more than US$120 million in taxes, the Project has provided vocational training to local employees and donated funds to establish a Chinese language school for international cultural exchanges. This commitment to improving the lives of local people, protecting the environment, and promoting economic development has brought new vitality into the Thar region, demonstrating Shanghai Electric’s dedication to building projects that empower communities.

    The Project is a testament to Shanghai Electric’s commitment to collaborating with local stakeholders to create long-term, sustainable solutions, and involved multiple rounds of discussion and consultation with local government, village headmen, and resident representatives to ensure a stable power supply throughout the open pit mine’s life cycle. Aiming to promote ecological construction through the adoption of a sprinkler irrigation system to enhance the ecological construction of the open pit mine, the Project also assisted the local government in resettling indigenous people in the mining area, improving their living conditions and access to clean water and electricity. By prioritizing local collaboration and sustainable development, Shanghai Electric has set a new standard for responsible energy solutions.

    Moving forward, Shanghai Electric will continue to actively fulfill its corporate social responsibility and advance its work with local communities for a better future.

    For more information, please visit Shanghai Electric.

    About Shanghai Electric

    Shanghai Electric Group Company Limited (SEHK: 2727, SSE:601727), a leading global supplier of industrial-grade eco-friendly smart system solutions with a presence around the world, is dedicated to smart energy, intelligent manufacturing, and the integration of digital intelligence. With the focus on low-carbon development and digital transformation by opening up new arenas and promoting new growth drivers, Shanghai Electric will strive to be a leader in the pursuit of to peak carbon dioxide emissions before 2030 and achieve carbon neutrality before 2060, new energy equipment production, and high-end equipment localization, utilizing the boundless opportunities in an innovative industrial ecosystem along with global partners.

    Photo – https://mma.prnewswire.com/media/2015381/WechatIMG58.jpg
    Logo – https://mma.prnewswire.com/media/1800747/logo_new_Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/shanghai-electric-complete-pakistans-largest-thermal-power-project-with-local-fuel-thar-block-1-integrated-coal-mine-and-power-project-for-30-days-301762751.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email

    Related Posts

    GSMA Foundry and Khalifa University to Accelerate AI Innovation with the development of TelecomGPT

    November 25, 2025

    MENA Emerges as Global Leader in Enterprise Digital Transformation, New GSMA Report Finds

    November 25, 2025

    Vantage Wins ‘Best Mobile Trading App – APAC’ at the UF Awards APAC 2025

    November 25, 2025

    Elton John AIDS Foundation and Zipline: $150M US State Department Boost Accelerates HIV Care Innovation

    November 25, 2025
    Latest News

    Egypt GDP rises 5.2% as foreign reserves climb

    June 8, 2026

    Korean cosmetics exports hit US$5.6 billion in five months

    June 8, 2026

    FAO backs $3.9bn GEF-9 funding for food security

    June 8, 2026

    WHO reports 507 Ebola cases across Congo and Uganda

    June 8, 2026

    UN envoy cites regional push to end Middle East conflict

    June 6, 2026

    Global health bodies seek $518 million for Ebola response

    June 6, 2026

    Dollar heads for weekly gain as yen nears 160 level

    June 5, 2026
    © 2026 Syria News Flash | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.